Air Transport Aircraft & Propulsion
Jun 27, 2008
ARINC will renew and upgrade its GLOBALink data link communications contract with Spirit Airlines for five more years. Integrated flight applications are expected to streamline operations.
Jun 27, 2008
TAM took delivery of two 174-seat A320s, bringing its fleet to 108 aircraft (15 A319s, 73 A320s, three A321s, 12 A330s, two A340s and three MD-11s). It plans to operate 123 aircraft at year end, adding two A330s, four 777-300ERs and two 767-300ERs (ATWOnline, June 25).
Jun 27, 2008
Air China said it will purchase 20 A330s valued at $3.82 billion, according to a statement obtained by several news services that the carrier issued yesterday to the Hong Kong Stock Exchange. Airbus did not confirm the order. CA said the aircraft will boost its capacity by 16.5% and allow it to increase flight frequencies from Beijing, according to Bloomberg. The airline will use cash, bank loans and debt instruments to pay for the aircraft. Delivery dates were not disclosed.
Jun 27, 2008
Frontier Airlines is bracing for another round of cuts, with plans to reduce capacity 17% from September to March 2009, the Associated Press reported. The carrier, which declared bankruptcy in April, will cut seven more Airbus narrowbodies from its fleet on top of the four A318s/A319s it agreed to sell in the spring (ATWOnline, March 24). Prior to the sale of those aircraft, it operated a fleet of 60 A318s/A319s. Its regional subsidiary Lynx operates 10 Q400s.
Jun 26, 2008
Rockwell Collins reached a deal with US Airways for provision of its WXR-2100 MultiScan Hazard Detection System and other avionics for A320s and A330s. System features advanced radar and weather assessment capabilities.
Jun 26, 2008
Biman Bangladesh Airlines placed an order yesterday for four 737-800s valued at about $320 million plus two options, bringing to 12 the number of Boeing aircraft it has ordered this year as it attempts to modernize its aging fleet.
Jun 26, 2008
China's new turboprop aircraft, the MA600 (an enhanced version of the MA60), is scheduled to roll out in Xi'an on Sunday. The MA600 was designed to optimize the MA60's structure and avionics system as well as improve its cabin interior. To date, the 50/60-seat MA60 has received 122 orders from Asia, Latin America and Africa, with seven aircraft delivered since 2005.
Jun 25, 2008
Boeing moved a 787 designated for fatigue testing from the final assembly line in Everett, Wash., to another production bay at the facility to complete assembly and start fatigue test preparation. Another 787 already is undergoing structural testing. The move paves the way for the second flight-test airplane to advance to the next position in the production line.