Singapore Changi Airport Unveils Post-COVID Redesign For Terminal 5

T5
A rendering of the new Terminal 5.
Credit: Changi Airport Group
SINGAPORE—The operator of Singapore Changi International Airport has unveiled the final design of its massive Terminal 5 (T5) project, which was halted two years ago during the depths of the COVID-19 pandemic. Construction is now expected to begin in two years, although the land is already being...
Chen Chuanren

Chen Chuanren is the Southeast Asia and China Editor for the Aviation Week Network’s (AWN) Air Transport World (ATW) and the Asia-Pacific Defense Correspondent for AWN, joining the team in 2017.

Subscription Required

 

Singapore Changi Airport Unveils Post-COVID Redesign For Terminal 5 is published in Aviation Daily, an Aviation Week Intelligence Network (AWIN) Market Briefing and is included with your AWIN membership.

Already a member of AWIN or subscribe to Aviation Daily through your company? Login with your existing email and password

Not a member?  Learn how to access the market intelligence and data you need to stay abreast of what's happening in the air transport community.