Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
Guy Norris (Los Angeles), Michael Mecham (San Francisco)
Activation of a third Boeing 787 final assembly line is intended to help ensure a smooth startup of production of the 787-9 as manufacturing rates increase to five aircraft per month by year-end. The 80th 787-8, destined for LAN Airlines, on Aug. 24 became the first fuselage to enter a “surge line” in the 40:24 bay at Boeing's main widebody campus in Everett, Wash. The main 787 assembly hall is the nearby 40:26 bay. The primary alternate line is 88:30 at Boeing's 787 factory in North Charleston, S.C.
LOS ANGELES — Space Exploration Technologies (SpaceX) is modifying its manufacturing flow at Hawthorne, Calif., as part of plans to boost production of Falcon 9 and Falcon Heavy rocket cores to 40 per year. The re-modeling is required to ramp up the rate to meet the existing and expected launch demand, says SpaceX President Gwynne Shotwell. “Next year we need to build one core per month, and then ramp up 50% year-over-year to be where we want to be.”