Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
General Electric has delivered the 1,000th GE90-115B engine as it continues to ramp up production in lockstep with Boeing’s move to a higher assembly rate for the 777 family. The engine, first revealed as the GE90-11XB in May 1999, became the exclusive powerplant for the longer-range 777-200LR and -300ER variants in July of that year. Since the first 777-300ER entered service in 2004, more than 1,500 GE90-115B engines have been ordered for the extended-range family, which also includes the 777 Freighter.
In the troubled world of defense acquisition, the U.S. Navy's Boeing P-8A Poseidon maritime patrol aircraft shines as a rare example of a program that appears to be broadly staying on both schedule and cost. After a slow start, test and development aircraft are racking up flight hours and the first production aircraft was delivered to NAS Jacksonville, Fla., on March 5, opening the way for the start of fleet training.
In the uncertain funded world of human spaceflight, the habit of die-hard propulsion engineers to never throw anything away is becoming increasingly useful as NASA looks for crew transports.