Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
LONG BEACH, Calif. — Boeing remains confident of bolstering its C-17 backlog with additional international sales on top of the expected order from India, despite the challenges of maintaining unit cost in the face of reduced production rates, possible gaps in the delivery stream and no new U.S. Air Force orders.
LOS ANGELES — The U.S. Air Force has officially accepted the first F-35 Joint Strike Fighter (JSF) from Lockheed Martin at the company’s Fort Worth facility. The milestone, which occurred with the formal acceptance of F-35A AF-7 on May 5, comes almost 10 years after the F-35 System Development and Demonstration contract was awarded to Lockheed, and more than 14 years after the signing of the original JSF development contract.
Boeing says that despite a one-month-long production freeze starting May 6 at its Everett site, initial deliveries of 747-8 freighter and passenger models remain on track for mid-year and the last quarter of 2011, respectively.