Guy Norris

Senior Editor

Los Angeles, CA

Summary

Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.

In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.

Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.

Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.

Articles

Guy Norris
Boeing says initial results from the first flight of the 787 give it confidence the certification program will be completed on schedule late next year. The first flight on Dec. 15 lasted three hours and five minutes, about two-and-a-half hours shorter than planned due to poor visibility. But the aircraft “flew better than in our simulators,” said 787 chief pilot Mike Carriker, who added all systems performed well. “This aircraft could turn around and fly again today, but we want to put more instrumentation in the aircraft.”

Michael Mecham, Guy Norris
The Boeing 787 successfully completed its first flight on Dec. 15, landing at Boeing Field after three hours and 10 minutes. The flight, which began from Everett’s Paine Field at 10:27 a.m., was cut short by encroaching bad weather, which made contact with the chase aircraft hard to maintain visually. Nonetheless, Boeing immediately declared the mission a major success, with initial parts of the flight envelope opened up.

Guy Norris
NASA’s Jet Propulsion Laboratory (JPL) engineers plan to continue diagnosis of what appears to be a seized up wheel on the already stranded Mars rover Spirit. The new problems with the right hand side rear wheel emerged during operations to try and free Spirit from soft soil where it has been trapped since late April when it broke through an unseen crust covering an old impact crater in an area dubbed “Troy” (Aerospace DAILY, Nov. 13).