Guy Norris

Senior Editor

Los Angeles, CA

Summary

Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.

In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.

Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.

Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.

Articles

Guy Norris (Los Angeles), Sean Meade (Charleston, S.C.)
Site clearance work is getting underway at North Charleston, S.C., on Boeing’s second 787 assembly line, while preliminary work to prepare the first aircraft for its long-delayed maiden flight has also begun in Everett, Wash. Flight-test engineers are believed to have conducted a safety-of-flight review of ZA001’s landing gear on Nov. 22-23, though Boeing declines to confirm “day-to-day” status on aircraft No. 1. The pre-flight system gauntlet tests, which will mark the start of the roughly three-week preparation toward first flight, have yet to begin.

Guy Norris (Los Angeles)
Airbus says the 28-month delay to the Boeing 787 flight-test program is bad news for the European manufacturer and the industry at large. “It does not do us or the industry any good when a program is as troubled as we were with the A380,” says Airbus Americas Chairman Allan McArtor. “Suppliers are hurting when a big program is delayed, so we’d like to see that program get going.”

Guy Norris (Los Angeles)
The U.S. Air Force faces growing and “unacceptable” sustainment and supportability issues with its nuclear weapons even as the newly established Global Strike Command readies to assume control of the nation’s ICBM missile force this week.