Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
Counting down Boeing’s long task lists leads to June 28 being a likely target for the first flight of ZA001, the first flight test article in the 787 program. Boeing will run through a series of six major ground tests from Friday through Sunday, June 21. They are broken into blocks of three. The first covers cover primary flight control system “axis” testing, which is to finish Saturday. The other focuses on functionality check out tests of the flight control management system and should wrap up by Sunday afternoon.
CFM International is in talks with Airbus over a potential upgrade for the CFM56-5B, which will be modeled on the recently unveiled -7BE “enhanced” engine for the Boeing 737. Upgrades and enhancements for the Airbus and Boeing engine variants have traditionally overlapped one another ever since the baseline -3 was introduced in 1984 and the -5 in 1988.
Pat Shanahan, VP and general manager of airplane programs at Boeing, hints that first flight of ZA001 could be a lot closer than the end of the month. Speaking at the Paris Air Show yesterday, Shanahan says the test team will conduct a flight readiness review this coming Saturday before progressing to final gauntlet tests.