Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
ORLANDO, Fla. Space Exploration Technologies (SpaceX) hopes to recover the spent first stage of its Falcon 1 launcher as early as the upcoming fifth test flight, says CEO and chief technical officer Elon Musk. The successful recovery of the used first stage is an important milestone for SpaceX, which is determined to reduce the cost of access to space in part by increasing the re-usability of rocket sections. The second stage also is designed to be recovered, though this is a more serious technical challenge, Musk says.
ORLANDO, Fla. The U.S. aerospace industry is running out of time to solve the growing crisis in recruiting to replace its aging workforce, and government action is needed for the U.S. to maintain world leadership, according to Lockheed Martin Executive Vice President for Advanced Development Programs and Strategic Planning Frank Cappuccio.
Boeing plans to complete firm design configuration of the stretched 787-9 version in the second half of 2009, but to save weight will not be restoring window positions lost as a result of fuselage join issues.