Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
EDWARDS AIR FORCE BASE, Calif. – NASA is poised to disassemble the Orion crew module test unit at its Dryden Flight Research Center here in preparation for transfer to the U.S. Army’s White Sands Missile Range for the delayed launch abort system tests. The boilerplate test module, built by NASA Langley, is nearing completion of a series of five mass-property tests to verify modeling predictions, and will later be transferred to the nearby space shuttle facility at Edwards.
NASA’s decision to defer servicing the Hubble Space Telescope until May 2009 will have a domino effect on efforts to replace the space shuttle with the shuttle-derived Ares I/Orion, possibly delaying a key test when time is money for the follow-on project.
Frank Morring, Jr. (Washington), Guy Norris (Edwards AFB, Calif.)
NASA’s decision to defer servicing the Hubble Space Telescope until May 2009 will have a domino effect on efforts to replace the space shuttle with the shuttle-derived Ares I/Orion, possibly delaying a key test when time is money for the follow-on project.