Guy Norris

Senior Editor

Los Angeles, CA

Summary

Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.

In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.

Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.

Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.

Articles

Guy Norris
PASADENA, Calif. – NASA is preparing to unstow the robotic arm on the Phoenix Mars Lander after restoring full communications via the Mars Odyssey orbiter. The instructions for what is the next critical phase of the exploration project were to be sent May 28 to Phoenix via the Mars Odyssey spacecraft after the agency decided to make it the principal relay vehicle following the unexpected shutdown of the UHF radio on the Mars Reconnaissance Orbiter (MRO) May 27 (Aerospace DAILY, May 28).

Guy Norris
PASADENA, Calif. – NASA has hit its first hiccup with the Phoenix Mars Lander mission following a radio shutdown on the Mars Reconnaissance Orbiter (MRO), which is being used to relay commands to the vehicle on the surface.

Michael Mecham (Everett, Wash), Guy Norris (Everett, Wash)
The 777 Freighter will begin flight testing within weeks, and already Boeing is drawing provisional plans for a freighter version of the 787. The sixth member of the 777 family, the freighter has a takeoff gross weight of 766,000 lb. and a range of 4,885 naut. mi. that allows it to slip in just below the payload capacity of the 747 series, Boeing’s best-known freighter family.