Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
Boeing has completed the bulk of a major re-organization of its Everett, Wash., 787 assembly lines, which together with ongoing modifications to the company’s production site in Charleston, S.C., have helped it achieve its targeted production rate of 10 787s per month earlier than scheduled. Although Boeing provisionally anticipated hitting the higher rate by year-end, the first aircraft to be produced at the 10/month rate is Line Number 152, an aircraft for Japan Airlines, which was loaded onto the surge line in Everett on Nov. 14.
Engine makers were among the big winners on the opening day of the Dubai Air Show, collectively bagging orders for more than 1,000 engines as part of the airline order bonanza announced by Airbus and Boeing Nov. 17.
Boeing says the Nov. 13 decision by the International Association of Machinists & Aerospace Workers (IAM) to reject a long-term contract extension deal gives it “no choice” but to look at alternate sites away from the Seattle area to assemble the 777X and its composite wing.