Jessica is Executive Editor of Business & Commercial Aviation magazine. She started as Editor of ShowNews Online, Aviation Week's on-site trade show daily published at the Paris Air Show, NBAA Annual Convention, Singapore Air Show and at other significant aerospace gatherings.
Jessica has worked in television production and management consulting. While not yet a licensed pilot, Ms. Salerno has received flight instruction and has soloed.
The first production-conforming aircraft, dubbed P1, is coming together at Cirrus’ facilities in Duluth, Minnesota, where the pressure vessel built at the company’s Grand Forks, North Dakota, facility and shipped to Duluth is being bonded to the tail and other components. Meanwhile, three conforming prototypes — C0, C1 and C2 — are taking part in the FAA certification program and have accumulated more than 400 hr. flight time. A fourth aircraft, a proof-of-concept model called V1, is also flyable.
The first production-conforming aircraft, dubbed P1, is coming together at Cirrus’ facilities in Duluth, Minnesota, where the pressure vessel built at the company’s Grand Forks, North Dakota, facility and shipped to Duluth is being bonded to the tail and other components. Meanwhile, three conforming prototypes — C0, C1 and C2 — are taking part in the FAA certification program and have accumulated more than 400 hr. flight time. A fourth aircraft, a proof-of-concept model called V1, is also flyable.
Cirrus Aircraft is expanding its “Vision Center” in Knoxville, Tennessee, after a site search that included 15 states and 30 airport locations, the company said.