Your home for critical insights and analysis on technological advancements, program development and emerging trends propelling the global aerospace & defense industry forward. Find out what’s next with our flagship publication.

AW&ST HUB | AEROSPACE | DEFENSE | SPACE | COMMERCIAL AVIATION | MRO

SUBSCRIBE NOW

Latest MRO Content by Aviation Week & Space Technology

Dec 31, 2012
Variable-area fan nozzles on the latest high-bypass engines could increase fuel efficiency and reduce airport noise. Pratt & Whitney is introducing the concept on its PW1100G for the Airbus A320NEO. but not on smaller versions of the geared turbofan. Current engines have fixed-area fan nozzles, designed as a compromise between climb and cruise. But the exit area needs to be larger for takeoff and smaller for cruise, so a variable nozzle optimizes the fan flow for each flight condition.
Dec 24, 2012
Singapore Airlines is retrofitting 10 of its Boeing 777-200ERs.
Dec 24, 2012
In November 2008, the year Wanda Austin became CEO of The Aerospace Corp., Aviation Week & Space Technology featured her on the cover with a three-page profile inside. “The fact that Austin is a woman and an African-American is impossible to miss,” the magazine wrote.
Dec 17, 2012
Turkish Technic is in the process of networking its entire MRO operation to better track, measure and control its resources.
Dec 17, 2012
Washington NTSB's revamped most-wanted list of safety improvements and a set of related recommendations are challenging the FAA to revisit its recently established position against mandating cargo aircraft fire-suppression systems.
Dec 17, 2012
In Paul McElhinney's first formal sit-down interview with the press, he tells Aviation Week about how GE will have to change and innovate to ramp up to service 45,900 engines in 2020
Dec 17, 2012
With a demand for higher levels of customer service, third-party logistics providers are developing services for the MRO industry that go far beyond basic warehousing and transportation. These include:
Dec 17, 2012
When Moog Aircraft Group launched its total support program for flight-control systems for the Boeing 787 and Airbus A350, the concept was simple: Guarantee airlines that a component will be ready to ship within 2 hr.—or as little as 10 min. in an aircraft-on-ground (AOG) situation—from a location no more than 6-7 hr. from anyplace in the world.