Future Attack Reconnaissance Aircraft (FARA)

By Brian Everstine
A potential mandatory cut in addition to ongoing continuing resolutions have military officials blasting congressional inaction on Pentagon plans.
Budget, Policy & Operations

By Brian Everstine
Competitors for the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) program have started the certification and installation process of the engine.
Aircraft & Propulsion

By Brian Everstine
GE Aerospace has delivered the second T901 engine for installation in the U.S. Army’s Future Attack Reconnaissance Aircraft prototypes.
Aircraft & Propulsion

By Brian Everstine
The U.S. Army plans to complete its analysis of alternatives (AOA) on the Future Attack Reconnaissance Aircraft by year’s end.
Aircraft & Propulsion

By Steve Trimble
The pending deliveries will allow Sikorsky and Bell to start installing the 3,000-shp-class turboshaft in the prototypes for the Raider X and 360 Invictus, respectively.
Aircraft & Propulsion

By Guy Norris
GE Aerospace says the first T901 flight test engine for the U.S. Army's FARA contest will be delivered to competitors Bell and Sikorsky in the next few months.
Paris Air Show

By Brian Everstine
The U.S. Army’s analysis of alternatives for its Future Attack Reconnaissance Aircraft is underway.
Budget, Policy & Operations

By Steve Trimble
The goal is to achieve size, weight and power savings for Future Armed Reconnaissance Aircraft and other existing Army rotorcraft, the RFI says.
Sensors & Electronic Warfare

By Brian Everstine
Poland in September 2022 announced plans to buy 96 new-build AH-64Es in an acquisition that could be worth up to $7 billion.
Budget, Policy & Operations

By Brian Everstine
The U.S. Army wants its Sikorsky UH-60 Black Hawk fleet flying for the next 40 to 60 years.
Aircraft & Propulsion

By Brian Everstine
The U.S. Army had previously planned to include surrogate engines for FARA prototypes in the event of T901 engine delays.
Aircraft & Propulsion

By Brian Everstine
The GAO denial of Sikorsky’s FLRAA protest shows the Army prioritized Bell’s submission detail and open systems architecture over Sikorsky’s much lower cost.
Aircraft & Propulsion

By Richard Aboulafia
The companies, services and people dependent on today’s promising new generation of aircraft would do well to heed the lessons of the past.
Budget, Policy & Operations

By Brian Everstine
Delivery of the first GE Aerospace T901 engines to Bell and Sikorsky for integration into their FARA prototypes has been delayed until early 2024.
Aircraft & Propulsion