EASA plans to start Boeing 737 MAX test flights on Sept. 7 in Vancouver, Canada in what is a key milestone for the aircraft to be recertified in Europe.
Boeing’s detailed instructions for modifying 737 MAXs as part of the FAA’s planned requirements call for more than 200 work hrs. per aircraft, with most of the effort needed for addressing non-compliant wiring.
Icelandair said it has completed agreements with all its creditors and reached a final settlement with Boeing on the impact of the grounding of the Boeing 737 MAX.
The FAA will issue a draft airworthiness directive (AD) with proposed design changes and crew procedures for a recertified Boeing 737 MAX, even as it continues working on requirements to return the airliner to service.
Norwegian Air Shuttle has accused Boeing of “gross negligence” and “clumsy production” in a lawsuit in which the LCC is claiming damages to compensate for the grounding of the 737 MAX and 787 engine troubles, Norwegian newspaper Dagens Næringsliv has reported.
Regulators have banned the use of Dupont’s Kathon FP 1.5 biocide in Boeing 737 MAXs, the first of what is likely to be a series of mandates to protect fuel systems from in-service incidents linked to the anti-microbial fuel system additive.
Updated pilot training to support the Boeing 737 MAX’s return to service incorporates human factors lessons learned from the model’s two fatal accidents and related probes, providing pilots with more and clearer information on systems and emergency scenarios, pilots who have reviewed the draft material tell Aviation Week.
WASHINGTON—A U.S. Transportation Department (DOT) Office of Inspector General (OIG) report on the Boeing 737 MAX’s certification underscores the inadequacy of communication between Boeing and the FAA that helped set the stage for two fatal accidents and the model’s ongoing grounding.
ULCC Norwegian has issued notice to Boeing of its intention to cancel orders for 92 737 MAX and five 787s, together with the GoldCare service agreements accompanying all of the aircraft.
A bipartisan U.S. Senate bill targeting FAA certification improvements places substantial emphasis on human-factors research and funding, echoing several reports produced in the wake of the Boeing 737 MAX accidents and subsequent grounding.
Aerostructures giant Spirit AeroSystems, the leading supplier to the Boeing 737 MAX program, is furloughing more workers after the OEM recently told it to cut o
FRANKFURT—TUI Group has reached an agreement with Boeing over compensation for delayed 737 MAX deliveries and a new schedule that will see the airline take outstanding deliveries much later.
Boeing formally has decoupled restarting production of the 737 MAX from the recertification effort for the grounded narrowbody, and the OEM and leading supplier
Recent fleet and training decisions at Alaska Airlines indicate plans for a future business model oriented almost exclusively around Boeing and the 737.
Boeing is acknowledging that changes to the 737 MAX will not earn FAA approval until after mid-year at least, with both the return-to-service timing and broader macroeconomic landscape driving how quickly production rates increase.