The four aerostructures, including the wing and fuselage sections, are being delivered to Embraer’s final assembly line in Gavial Peixoto, Sao Paulo state.
The contractual agreement enables Canada to order the first four F-35As for delivery in 2026 in the Lot 18 production standard, with 84 more delivered by 2034.
As development starts winding down, Saab’s Gripen E unit is focusing on improving the global fleet of C/D models and starting to consider what comes next.
GE Aviation says it will use a modified Saab 340B regional airliner as a flying testbed for hybrid electric propulsion technology to be evaluated as part of NASA’s Electric Powertrain Flight Demonstration (EPFD) program.
C&L Aviation Group has redelivered its first Saab 340Bplus passenger-to-cargo conversion, with another five of the type scheduled for completion by the end of 2022.
The move activates the final assembly line nearly 29 months after the U.S. Air Force awarded Boeing a $9.2 billion contract to supply 351 jets and 46 simulators to replace the Northrop T-38C Talon.
Sweden hopes to keep part of its C/D-model Saab Gripen fighter fleet in service beyond 2030 as it looks to strengthen the country’s defense capabilities against what it sees as a growing regional threat from Russia.
Australian carrier Regional Express Holdings (Rex) is a rare example of an airline looking to make new fleet moves to take advantage of market opportunities despite the COVID-19 crisis.